 |

 After the rig has been transported and unloaded at the drilling location, the site must be flat and free from debris. Depending upon the location, we use bulldozers and backhoes to clear the site, taking precautions to be respectful of the surrounding environment. We have two Fiat Allis bulldozers equipped with winches and a John Deere backhoe.

After rigging up, we begin the process of drilling the conductor hole (if required), the rathole, and the mousehole making sure that our field crew is outfitted with necessary safety attire.
|
 |